2024 Ekeonga School for Children

School and Dorm Building Project

The Children in Ekeonga have been without dormitories and with basic classrooms for many years. We are partnering with Agustus, Martha, and Steve to build a new storied building that will include 6 new classrooms and new dormitories for the kids. Please join us in prayer and support for these precious children and their families. The Cost is attached as a breakdown below, it is 3.8 million Ksh.

MOGISA GENERAL SERVICES LTD
P.O BOX 113-40211, KENYENYA.
MATERIALS AND COST FOR BUILDING
FOR EKEONGA CHILDCARE MINISTRY
BARS:
D16 140 PCS X3200=KSH.448,000
D12 80 PCS X 1900=KSH.152,000/=
D10 90 PCS X 1300=KSH 117,000/=
D8 110 PCS X 900=KSH 99,000/=
BINDING WIRE 5 ROLLS X 4500=KSH 22,500/=
EXCAVATION OF TRENCHES 20,000/=
BALLAST 15 LORRIES X 25000=375,000/=
SAND 10 LORRIES X 22000=220,000/=
CEMENTS 500 BAGS X 800= 400,000/=
HARDCORE 7 LORRIES X 12000=KSH 84,000/=
BRICKS 12000 PCS X 14=KSH 168,000/=
DPM 4 ROLLS X 3500= KSH 14,000/=
DPC 1 ROLL Ksh 4,000/=
TIMBER KSH 120,000/=
IRON SHEETS 80 PCS (2.5M) X1000 = KSH. 80,000
NAILS 70 KGS X 150 KSH. 10,500
DOORS 14 PCS X 10000=KSH 140,000
WINDOWS 13 PCS X 6000= KSH 78,000/=
ELECTRICALS KSH 100,000/=
MURRAM 5 LORRIES@8,000=KSH 40,000/=
CELLING KSH 60,000/=
WALLBARS 6 ROLLS @ 4,500=27,000/=
WATERPROOF CEMENT 40 LITRES @ 5500=KSH 11,000/=
RED OXIDE 20 PKTS @ 350/= KSH 7,000/=
PROPS 300PCS@ 100=KSH 30,000/=
TOTAL COST OF MATERIALS 2,827,000/=
ADD LABOUR 848,100/=
ADD 5 % CONTINGENCY SUM 141,350/=
TOTAL COST KSH 3,816,450/=
(Three Million, eight hundred and sixteen thousand four hundred and fifty shillings only)

Richard & Julie Cox